PIEQF Shake Table Assemblage Removed
Removal of shake table complete, hydraulic pump removed. NOW for control bunker and step up transformer. PIEQF Stream box has been disconnected. The last frame remains on the PIEQF Webcam HERE.
Rain is due to fall in Parkfield tonight or tomorrow. Container is being packed and Thanks Giving Looms and very much looking forward to it.
77 Days to assemble and test PIEQF, 91 days of continuous autonomous operation, 8 days to Remove, 43000 Webcam Frames, 7862400 Seconds of long play recording and 4-4500 Seismic Events. ( To Be Tallied)